Quick answer

A protective case quotation only becomes firm when the buyer hands over four blocks of information: the packed dimensions and mass of the equipment plus the clearance you require, the order quantity and the annual estimate, the interior and material brief including foam, colour and logo, and the delivery terms including destination and whether you need EXW or FOB. Anything less and a manufacturer can only return a price range, because the variables that move unit cost and tooling have not been fixed. Give the complete package and you can compare real numbers between suppliers.

Key points

  • Give quantity, annual estimate and packed mass, not just a model name you liked.
  • State the internal dimensions you need and the external footprint you must not exceed.
  • Describe the interior as a function, pluck, cube or machined, and name the foam thickness per axis.
  • Fix EXW or FOB and the destination so freight and responsibility are not guessed.
  • Compare quotes line by line; a price that excludes foam or changes the wall is not lower.

Why a thin enquiry returns a range, not a price

A supplier prices the specific article you will actually receive, so every undefined variable is a risk they add back into the quote or quietly leave out. If quantity is missing, the tooling share and the packaging are guessed; if the interior is missing, the foam is estimated; if the destination and the term are missing, freight and responsibility stay unclear. The buyer who supplies the complete brief receives a comparable number, while the buyer who does not receives a brochure price that cannot be checked.

Writing the brief down also protects you, because the same page becomes the acceptance criteria and the purchase-order attachment rather than a chain of scattered messages.

The specification block

Start with the physical facts: the internal length, width and height you need with the clearance stated as a number, the packed mass, the quantity for the first order and the expected annual volume. Add the external constraint when the case must fit a pallet, a rack, a vehicle bay or an airline limit, because that caps the shell you are allowed to buy just as surely as the equipment sets a floor for it.

The interior, material and finish brief

Describe the interior as a function rather than a mood: pluck foam, cube-cut foam, a machined pocket for each item, or an empty shell with dividers, and note which items must stay together. State the shell material preference if you hold one, the colour, whether a logo is moulded, printed or on a plate, and any hardware such as latches, hinges, a pressure-equalising valve, wheels or a telescopic handle. Each of those choices changes the unit price on its own line, so naming them up front is what makes two quotes comparable.

What moves the quote versus what only changes the finish

Separate the answers that change the tooling or the unit price from the ones that only change decoration. That way you know what must be fixed before a quote can be trusted and what can be settled later without reopening the price. The table below is a plain reading of that split for a typical case enquiry.

Rfq ItemMovesGive
Order quantity and annual estimateunit price and tooling sharefirst order quantity plus a 12-month forecast
Packed dimensions and massshell size, wall and handlinginternal L x W x H plus stated clearance and packed kg
Interior type and foammaterial and labourpluck, cube or machined, with thickness per axis
Colour and logomostly decoration and minimum ordercolour reference and logo file with method
Delivery term and destinationresponsibility and paperworkEXW or FOB, and the port or city

Delivery terms, destination and what KeXin does not offer

State the term you want and the destination, and expect the quotation to be issued EXW or FOB from the factory. KeXin works on wholesale and OEM orders only: there is no retail sale, no DDP door delivery and no overseas warehouse, so your own forwarder and customs process handle the leg from the port. Plan the schedule around the factory gate and the shipping window rather than assuming local stock.

Applications and how the same brief changes by use

A field kit driven to a site and back, an instrument air-freighted once, and a communication set that lives on a shelf all need different answers even when the equipment box is the same size. Say which one it is, because the application changes wall thickness, closure count, foam grade and whether wheels make sense, and a supplier who knows the use can flag where a stock shell already fits your case.

Customisation, OEM and private label

If no published model fits, ask for OEM or a custom shell and provide the measurement record and the target quantities up front. A first-article sample of an OEM configuration generally takes about forty-five days and a new mould about one hundred and twenty-five days, with a thirty percent deposit; say which you need so the quote reflects tooling rather than a stock item. KeXin New Materials (Guangdong) Co., Ltd. supplies under these wholesale and OEM terms and will confirm the route before production.

Purchasing notes and comparing quotes

When quotes arrive, compare them line by line against the same brief: quantity, unit price and its tooling share, sample and production lead time, the interior specification, and the term the price is quoted on. A lower number that excludes foam or quotes a thinner wall is not a lower price. Fix the specification in writing before the balance is paid so that goods-in is a check against an agreed sheet, not a surprise.

Custom foam liner being prepared for a protective case
Custom foam liner being prepared for a protective case
Custom foam liner being prepared for a protective case
Custom foam liner being prepared for a protective case
Custom foam liner being prepared for a protective case
Custom foam liner being prepared for a protective case
Custom foam liner being prepared for a protective case
Custom foam liner being prepared for a protective case

Customisation

Everything described above is configurable on a standard shell: interior layout (pick-and-pluck, die-cut or CNC-cut), foam grade and thickness, colour, logo method, latch and lock count, pressure-equalisation valve, cable ports, document holder and identification plate. A bespoke exterior geometry requires a new mould — 125 days, from 3,000 units per moulded component.

Procurement considerations

QuestionWhat to send us
Which shell fits?Equipment L × W × H as packed, plus required clearance per axis
What does it cost?Order quantity and estimated annual quantity — the two drive different answers
Is tooling needed?Whether an existing shell clears the envelope with usable foam depth
Lead time?Your required delivery date, not just the order date
Certification?The exact standard your tender names — we will say whether we can test to it
Freight?Destination and preferred terms; carton and pallet data supplied with the quotation

Comparison and selection guide

The tables on this page exist because a protective case is chosen by comparing three things: the envelope, the environment and the handling chain. Where no table applies, the rule below is.

SituationWhat To Do
Start from the equipment, not the caseMeasure the tallest, widest and longest points of the packed equipment including antennas, handles and connectors. Add 20 mm minimum clearance per axis before selecting a shell.
Then choose the carrying methodUnder 8 kg, a fixed handle is lighter and cheaper. Over 12 kg or any journey over 30 m, specify the T series with telescopic handle and wheels.
Then decide the interiorPick-and-pluck for kits that change. Die-cut or CNC-cut for fixed layouts that must be auditable at a glance.
  • Size on internal dimensions plus clearance, never on a product name.
  • Choose the carrying method before the shell: it changes the series, not just the price.
  • Specify the interior last, and decide up front whether the end user will reconfigure it.
Entity relationships

What information should a buyer provide when requesting a protective case quotation? relates to Procurement Guide. Related families: Military Protective Cases / Custom Protective Cases / Equipment Transport Cases. Related sectors: field and industrial equipment. Continue in the Procurement Guide cluster.

Next step

This page is written from our own production data. If your requirement differs, send the dimensions and we will tell you which of the 155 models fits, or whether a custom route is needed.

Talk To The Manufacturer→Find the Right Case

FAQ

Frequently asked on this topic

What information should a buyer provide when requesting a protective case quotation?

Provide the packed dimensions and mass with the clearance you need, the first-order quantity and the annual estimate, the interior and material brief including foam, colour and logo, and the delivery terms with destination and whether you want EXW or FOB. With those four blocks a manufacturer can return a firm, comparable price instead of a range.

Why does the quantity change the price so much?

Quantity sets how tooling, moulding and packaging are spread across the order and whether a stock shell or a new mould is economic. Give the first-order quantity and a twelve-month forecast so the supplier prices the run you actually intend rather than the smallest batch they could sell.

What should I say about the interior?

Explain what the interior must do: pluck or cube-cut foam, a machined pocket per item, or an empty shell with dividers, plus which items stay together and any handle, wheel, latch or valve requirement. The interior drives material and labour and is often one of the largest single cost lines in a custom case.

Can the factory ship door-to-door or hold stock overseas?

No. Orders are wholesale and OEM only, quoted EXW or FOB from the factory, with no retail sales, no DDP delivery and no overseas warehouse. Use your own freight forwarder for the leg from the port and plan landed timing around the production and shipping window you agreed.

Related

Continue in Procurement Guide

PROCUREMENT

Protective Case Procurement Checklist

PROCUREMENT

MOQ, Tooling And Unit Cost: How They Interact

PROCUREMENT

Protective Case Factory Versus Trading Company

PROCUREMENT

OEM vs ODM vs Private Label Protective Cases

PROCUREMENT

What Should International Buyers Ask a Protective Case Manufacturer?

OEM

Can Defense Equipment Cases Be Customized? What Changes and What Needs a New Tool

PROCUREMENT

How should international buyers evaluate a protective box supplier?

COMMERCIAL

Cases for Test & Measurement Instrument & Fors

TECHNICAL

Protective Cases for Test, Measurement & Inspection Instruments for High-Precision Work

COMMERCIAL

Cases for Hand Tools, Power Tools & Hardware in Factory Maintenance

TECHNICAL

Protective Cases for Machinery, Moulds & Spare Parts for Automation Lines

COMMERCIAL

Protective Cases for Machinery, Moulds & Spare Parts

COMMERCIAL

Cases for Robot End Effectors, Controllers & Spare Parts

COMMERCIAL

Cases for Sensor & Probe Test Instruments

OEM

Can Camping Equipment Cases Be Customized? What A Manufacturer Can Actually Change

COMPARISON

How do buyers compare internal vs external dimensions across protective case suppliers?

COMPARISON

How Do Buyers Compare Case Locks Across Protective Case Suppliers? A Closure-Field Method

PROCUREMENT

How should buyers choose an outdoor case?

OEM

Can Photography Cases Be Customized? Stock, Modified And Full OEM Compared

KNOWLEDGE

What are the common mistakes in case locks for equipment transport cases

PROCUREMENT

What Information Should Be Provided About Case Weight Before A Quotation?

KNOWLEDGE

Battery Module Tester Explosion-Proof Safety Box

KNOWLEDGE

Industrial Pressure Test Pump Matching Box

KNOWLEDGE

Explosion Proof Hard Safety Box Export Factory

Military Protective Cases
PRODUCT FAMILY

Military Protective Cases

Custom Protective Cases
PRODUCT FAMILY

Custom Protective Cases

Equipment Transport Cases
PRODUCT FAMILY

Equipment Transport Cases