Military transit case, dustproof and waterproof: how an IP6X or IPX7 request is answered
An IP6X and IPX7 request is answered by mechanism and evidence, not by a printed badge. The first digit describes protection against solid particles, with 6 meaning dust-tight; the second describes water, with 7 meaning temporary immersion under defined conditions. Both are laboratory results for one assembly, tested in one state, and neither survives a lid left open or a cable gland added later. Our sheet records water and dust as not measured on all 155 models and prints no ingress code on any of them: 113 models carry the military tag, 100 of those offer a compressible gasket in a continuous moulded channel, 19 are trolley cases with wheels and a telescopic handle, and where a tender needs a number we quote accredited testing against the exact model, seal configuration and load state you order. This article sets out what the digits measure, the corrosion line we do record as measured, the temperature question we leave open, and the published sizes and order terms behind a military transit case.
Key points
- An ingress code belongs to one tested assembly in one state; it says nothing about a production batch or a case modified after the test.
- We print no ingress code on any of the 155 shells; water and dust are recorded as not measured and quoted testing is a separate scope.
- 100 of the 113 military-tagged models offer a compressible gasket in a continuous moulded channel; the remaining 13 are unsealed shells.
- Corrosion resistance is the protection line we record as measured: a thermoplastic shell with no ferrous corrosion path.
- Temperature, UV, stack load and drop height are not measured on the military models; silence on a datasheet is not a capability.
- Settle the equipment envelope, the carry method and the test scope before colour or logo; those three decide the model and the price.
What an IP6X and IPX7 request actually asks a case supplier for
Buyers write the code as a two-digit string, solids first and liquids second, and use X for a digit that was not tested. A solids digit of 6 describes a dust-tight enclosure: no dust ingress under the conditions of the test, with the sample run in the orientation and state defined by the protocol. A liquids digit of 7 describes temporary immersion for a stated time and depth; 8 moves to continuous immersion at a greater depth agreed between buyer and laboratory. Written alone, the solids part appears as IP6X and the liquid part as IPX7, because a single-digit test leaves the other position untested rather than satisfied. In a military transit tender the code usually arrives as a sentence: the case must be dustproof and survive a river crossing or a wash-down. Turning that sentence into a digit is the buyer's first decision, and it depends on the duty rather than on the highest number available.
The code does not describe the case in service. It does not fix how long a worn gasket keeps its compression, what happens when the lid is closed on a grain of sand, or whether an added cable pass-through changes the assembly that was tested. It is a result for a sample, not a warranty for a family. That is why our own sheet records waterproof and dust performance as not measured on all 155 models and prints no ingress code on any of them. Where a tender needs a document, we quote accredited testing as a separate work package against the model, seal configuration and load state you will actually ship, and the report is issued to you.
What our military model data publishes, and what it leaves unmeasured
The sheet is a size and material record before it is a protection record. Of 155 shell models, 113 carry the military tag. Within that group, 100 offer a seal as a compressible gasket in a continuous moulded channel and 13 offer no seal at all; 19 are trolley cases with wheels and a telescopic handle; shell material splits into 68 polypropylene, 30 engineering polypropylene, 14 ABS and one PP and ABS shell; and a wall thickness is recorded on 106 of the 113, running from 2.1 mm to 6.0 mm. The rest of the protection block is explicit about its limits: temperature, UV, water, dust, stack load and working load are recorded as not measured, and no ingress code is stated.
| Property | Published Status | What It Means For Your Specification |
|---|---|---|
| Property | Published status | What it means for your specification |
| Sealing option | Offered on 100 of the 113 military models; none on 13 | Shortlist the sealed group for dusty or wet duty; the 13 plain shells suit dry indoor storage and frequent opening. |
| Gasket | EPDM or equivalent compressible gasket in a continuous moulded channel; recorded as measured | A replaceable consumable part of the case, not a permanent property of the shell. |
| Wall thickness | Recorded on 106 models, 2.1 mm to 6.0 mm | Read it per model; the range across the group is not a family guarantee. |
| Corrosion resistance | Measured: thermoplastic shell, no ferrous corrosion path | A material fact you can rely on for salt air and splash, subject to checking agent compatibility. |
| Water and dust | Not measured on all 155 models | No ingress code is printed; ask for a quoted test if your tender needs a number. |
| Temperature and UV | Not measured on all 155 models | Define the storage and operating range in the RFQ and request conditioning data. |
| Stack and working load | Not measured on all models | Test the loaded case rather than the empty shell if stacking is part of the duty. |
Dust: the gasket channel, the latches and the valve decide it
Dust enters a closed case at the rim, around a latch pocket, through a pressure valve and through any hole cut for a cable. The shell resin is not the deciding factor: polypropylene and ABS do not absorb water and do not crumble in dry sand, but neither will keep a talc-fine dust out of a rim that is not sealed. On our military models the sealed option is a compressible gasket sitting in a continuous moulded channel: continuous because a joint in the channel is a path, and moulded because a channel cut after moulding loses the compression geometry. Latch count is specified per configuration, and a latch body that accepts a standard padlock is recorded as measured across the range.
A seal is a maintained state. Clear the channel before every close, especially after sand, salt or a chemical spill; check the gasket for permanent set each season and replace it rather than over-tightening the latches; store the case with latches released so the gasket is not compressed for months at a time. If the duty is a dry store or an indoor bench and the case is opened a dozen times a day, one of the 13 unsealed shells is the more honest choice: less to inspect, faster to open, and no gasket to replace.
Water: rain, jets and immersion are three different duties
Splash and rain are a drainage problem around the rim; a jet adds pressure and finds latch pockets and valve seats; immersion adds head pressure and time, and the deeper or longer the immersion, the more gasket compression and shell stiffness matter. Temperature cycling is the quiet variable: a sealed case carried from a hot vehicle into a cold store pulls a pressure difference across the gasket, which is what a pressure-equalisation valve is for. On our models the valve is a manufacturer option and is not fitted as standard. It changes the tested assembly, so it has to be part of the configuration you name when you ask for a test.
If your requirement is written as a code, put the code, the standard edition, the sample state and the test house in the RFQ. We quote accredited testing against the exact model and seal configuration, and the report can be issued to your programme. If the requirement is written as a duty, describe the duty: how deep, how long, fresh or salt water, loaded or empty, and how often. That description is often more useful than a digit, because it tells the laboratory what to reproduce. Our guide to how waterproof cases actually work covers the seal mechanics, and the article on what an ingress rating does not tell you covers the boundary of the claim.
Anti-corrosion for chemical test equipment: the one line we measure
Chemical test kits are the hardest interior to specify because the kit itself is the hazard: reagents in glass or HDPE, a calibration record, and sometimes a spill that stays in the foam for a shift. The protection line we record as measured is corrosion resistance: the shell is thermoplastic, with no ferrous corrosion path, so the body does not rust from a splash or from salt air. That is a statement about the shell, not about every part of the case. Hinges, latches and any metal insert are supplied hardware, and their finish has to be specified for the environment.
Chemical resistance to a named agent is not measured, and we will not imply it from the shell material. If the case will hold reagents or be wiped with a solvent, send the agent list with concentration, temperature and contact time, and ask for compatibility testing as part of the quotation, either as a wipe test or as immersion of a coupon. Two design details matter as much as the resin: an open-cell foam can hold a spill against the shell for hours, and a case with no drain point keeps it there. A closed-cell foam, a removable tray or a liner that can be lifted out is often the difference between a wipe-down and a write-off.
| Question For The Rfq | Why It Changes The Answer |
|---|---|
| Question for the RFQ | Why it changes the answer |
| Which agents, at what concentration? | Dilute and concentrated solutions of the same chemical behave differently on a polymer surface. |
| At what temperature and for how long? | Contact time and temperature drive absorption; a splash and a weekend soak are different tests. |
| Wipe, splash or immersion? | The method changes the coupon and the acceptance criterion you are buying. |
| Does the foam stay in the case after a spill? | Open-cell foam holds liquid against the shell; a removable liner can be taken out and cleaned. |
Extreme temperature: what the sheet records, and how to test for it
Temperature range is recorded as not measured on every military model, so we do not print a number. That is not a dodge: a storage range and an operating range are different claims, a single cycle and a hundred cycles are different tests, and a gasket that stays elastic in a laboratory may take a permanent set after a month in a container. The honest specification names the duty: the lowest and highest temperature the loaded case will see, whether that is storage or in use, how long it stays there, and whether the case is opened at that temperature.
The case features that matter at the extremes are the same ones that matter for dust and water: gasket compound, compression, latch pre-load and the difference between a polypropylene and an ABS shell. We can quote oven or freezer conditioning followed by a seal check at an accredited laboratory, against the model and configuration you order, and the report is issued to you. If your programme carries a temperature requirement in a tender document, put the requirement and the test method in the RFQ rather than a range copied from another supplier's datasheet.
Published military transit sizes from the sheet
The table below is read from the product sheet, per model, and it is not a family capability. External dimensions are the outside envelope including feet and hardware; internal dimensions are the clear cavity; usable interior volume is smaller than the geometric internal volume because ribs, hinge mouldings and lid geometry take space; net weight is the empty case. All eight models offer the gasket seal, and every trolley model carries wheels and a telescopic handle, which matters when a loaded case has to move across a flight line or a hangar floor.
| Model | External Mm | Internal Mm | Usable Interior L | Wall Mm | Net Weight Kg | Wheels |
|---|---|---|---|---|---|---|
| Model | External mm | Internal mm | Usable interior L | Wall mm | Net weight kg | Wheels |
| WL8-8442 Trolley | 843 x 592 x 415 | 740 x 518 x 364 | 111.6 | 5.0 | 15.32 | Yes |
| WL8-8434 Trolley | 843 x 592 x 335 | 740 x 518 x 284 | 87.1 | 5.0 | 14.03 | Yes |
| WL8-7336 | 733 x 505 x 357 | 650 x 430 x 310 | 69.3 | 5.0 | 10.66 | Yes |
| WL8-6836 Trolley | 677 x 535 x 364 | 595 x 460 x 315 | 69.0 | 4.8 | 10.60 | Yes |
| WL8-5835 Trolley | 588 x 475 x 353 | 500 x 400 x 305 | 48.8 | 5.0 | 8.52 | Yes |
| WL9-7227 Trolley | 720 x 500 x 270 | 590 x 435 x 210 | 43.1 | 6.0 | 10.00 | Yes |
| WL6-6232 Trolley | 615 x 440 x 320 | 507 x 385 x 290 | 45.3 | 5.3 | 7.94 | Yes |
| WL3218 | 315 x 260 x 180 | 308 x 230 x 172 | 10.5 | 3.0 | 0.90 | No |
Choosing a military transit case: five decisions in order
Start with the equipment envelope and the interior layout, then the carry method, then the seal, then the test scope, and only then the colour and the logo. The order matters because each decision narrows the model list and changes the price, and reversing it produces a specification that no stock shell can meet. A common failure is to choose a litre figure first: two cases with the same internal volume can differ by 60 mm in internal length, and the longer item decides.
Customisation, order terms and what we do not do
Customisation covers foam layout, colour, logo, packaging, hardware and private label, and a bespoke shell is available where a stock geometry cannot meet the footprint. Quotation thresholds on stocked shells follow the sheet: one unit for a standard model or a custom foam layout, around 300 units where a logo, a colour or an OEM marking needs a batch or a fixture, and around 3,000 per moulded component where a new shell geometry is required. Lead time is 45 days from approved drawing and deposit on an existing mould, and 125 days when a new mould has to be cut. A 30% deposit is the standard term, with the balance settled against the shipping documents.
We supply wholesale and OEM buyers only: agencies, distributors and programme contractors, on EXW or FOB terms from Guangdong. We do not sell to individual officers or consumers, do not quote DDP, and hold no overseas warehouse, so the freight plan is yours and the carton and pallet data are published so you can build it. Container loading figures for 20GP, 40GP and 40HQ are supplied with the quotation rather than printed on the sheet, because they depend on the carton and the mix. First articles, third-party inspection and factory audit by appointment are available, and any test report is issued against the configuration you name.
Before you sign: a short procurement check
Put the model number, the seal configuration, the interior layout, the load state and the test scope in one document, and ask the supplier to quote against that document rather than against a family name. Two clarifications save most disputes: whether the quoted dimensions are internal or external, and whether the reported litres are the geometric internal volume or the usable interior volume. On our sheet both figures are published, and the usable figure is the one to compare against your equipment plus foam.
Ask for the gasket material and the replacement route, because a seal is a service part that will be changed more than once in a ten-year life. Ask what is recorded as measured and what is recorded as not measured, and do not accept a datasheet that quietly omits the difference. The procurement checklist on this site lists the same questions in the order a programme office usually asks them, and the container loading guide covers the freight plan that follows the order.




Customisation
Everything described above is configurable on a standard shell: interior layout (pick-and-pluck, die-cut or CNC-cut), foam grade and thickness, colour, logo method, latch and lock count, pressure-equalisation valve, cable ports, document holder and identification plate. A bespoke exterior geometry requires a new mould — 125 days, from 3,000 units per moulded component.
Procurement considerations
| Question | What to send us |
|---|---|
| Which shell fits? | Equipment L × W × H as packed, plus required clearance per axis |
| What does it cost? | Order quantity and estimated annual quantity — the two drive different answers |
| Is tooling needed? | Whether an existing shell clears the envelope with usable foam depth |
| Lead time? | Your required delivery date, not just the order date |
| Certification? | The exact standard your tender names — we will say whether we can test to it |
| Freight? | Destination and preferred terms; carton and pallet data supplied with the quotation |
Comparison and selection guide
The tables on this page exist because a protective case is chosen by comparing three things: the envelope, the environment and the handling chain. Where no table applies, the rule below is.
| Situation | What To Do |
|---|---|
| Start from the equipment, not the case | Measure the tallest, widest and longest points of the packed equipment including antennas, handles and connectors. Add 20 mm minimum clearance per axis before selecting a shell. |
| Then choose the carrying method | Under 8 kg, a fixed handle is lighter and cheaper. Over 12 kg or any journey over 30 m, specify the T series with telescopic handle and wheels. |
| Then decide the interior | Pick-and-pluck for kits that change. Die-cut or CNC-cut for fixed layouts that must be auditable at a glance. |
- Size on internal dimensions plus clearance, never on a product name.
- Choose the carrying method before the shell: it changes the series, not just the price.
- Specify the interior last, and decide up front whether the end user will reconfigure it.
Military transit case, dustproof and waterproof: how an IP6X or IPX7 request is answered relates to Military Case Guide. Related families: Military Protective Cases / Military Transport Cases / Waterproof Cases / Custom Protective Cases. Related sectors: field and industrial equipment. Continue in the Military Case Guide cluster.